Join link: https://reliabilityfirst.webex.com/reliabilityfirst/j.php?MTID=m6f326c56ba425fae97a4aefde4ca35a5
Meeting number: 2316 464 8125
Meeting password: 0123456 (0123456 when dialing from a phone or video system)
Join by phone:1-650-479-3207 Call-in toll number (US/Canada)
Access code: 231 646 48125
NERC Reliability Standard compliance abeyance period overview
Lonnie Ratliff, Director of Compliance Assurance and Certification, NERC
Lonnie Ratliff will provide an overview of how the compliance abeyance period will be implemented across the Compliance Monitoring and Enforcement Program (CMEP) process. This is a recently introduced aspect of the CMEP process and will be applicable starting with EOP-012-3 R1 Part 1.1.
An interactive look at how renewable generation impacts Power Systems Operation
Bill Smith, President, Powersmiths International, Inc.
Bill Smith will be discussing the impact of renewable generation on Power Systems Operation through a simulated OPS-X exercise, an interactive training tool developed by his company, Powersmiths International.