BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ReliabilityFirst - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rfirst.org
X-WR-CALDESC:Events for ReliabilityFirst
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230802T130000
DTEND;TZID=America/New_York:20230802T170000
DTSTAMP:20260424T130606
CREATED:20231108T165339Z
LAST-MODIFIED:20240223T183718Z
UID:7134-1690981200-1690995600@www.rfirst.org
SUMMARY:Protection System Workshop
DESCRIPTION:Please mark your calendars for the upcoming ReliabilityFirst Protection System and Human Performance Workshops. For 2023 we have opted to have both of our workshops entirely virtual this year.  The agenda and additional information are currently being developed and will be available soon.\n \nIntended Audience \nThe ideas\, suggestions and stories shared during this highly interactive\, free event are especially relevant for: \n\nSubstation and Transmission Maintenance personnel\nProtection and Controls experts\nOperations Control Rooms\, including tools support personnel for EMS\, SCADA\, etc.\nAsset Design Groups (substation and transmission)\nHuman Resource Professionals\nAsset Management Groups\nInternal Control Champions and Specialists\nCompany Trainers\nLeadership and others interested in these topics \n\nRegistration is now open. There is no fee and this event is open to anyone who would like to attend. If you have any questions\, please contact John Idzior or Thomas Teafatiller.​ \nReference Materials: \n2023-08-02 Protection System Workshop Agenda
URL:https://www.rfirst.org/event/protection-system-workshop-2/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
CATEGORIES:Webinars
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230803T080000
DTEND;TZID=America/New_York:20230803T120000
DTSTAMP:20260424T130606
CREATED:20231108T172158Z
LAST-MODIFIED:20240223T183551Z
UID:7137-1691049600-1691064000@www.rfirst.org
SUMMARY:Human Performance Workshop
DESCRIPTION:Please mark your calendars for the upcoming ReliabilityFirst Protection System and Human Performance Workshops. For 2023 we have opted to have both of our workshops entirely virtual this year.  The agenda and additional information are currently being developed and will be available soon. \nIntended Audience \nThe ideas\, suggestions and stories shared during this highly interactive\, free event are especially relevant for: \n\nSubstation and Transmission Maintenance personnel\nProtection and Controls experts\nOperations Control Rooms\, including tools support personnel for EMS\, SCADA\, etc.\nAsset Design Groups (substation and transmission)\nHuman Resource Professionals\nAsset Management Groups\nInternal Control Champions and Specialists\nCompany Trainers\nLeadership and others interested in these topics\n\nRegistration is now open. There is no fee and this event is open to anyone who would like to attend. If you have any questions\, please contact John Idzior or Thomas Teafatiller.​ \nReference Materials: \n2023-08-03 Human Performance Workshop Agenda
URL:https://www.rfirst.org/event/human-performance-workshop/
LOCATION:Virtual (Webex)
CATEGORIES:Webinars
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230814T140000
DTEND;TZID=America/New_York:20230814T153000
DTSTAMP:20260424T130606
CREATED:20231031T172734Z
LAST-MODIFIED:20231208T132423Z
UID:5232-1692021600-1692027000@www.rfirst.org
SUMMARY:Technical Talk with RF
DESCRIPTION:Agenda Topics​​: \nThe 2003 Northeast Blackout: What the Bulk Electric System was like before this event\, what’s changed since and the path forward.  \nJoseph McClelland\, Director of the Office of Energy Infrastructure Security\, FERC \nDavid Nevius\, former Senior Vice President (retired)\, NERC \n\nJoe McClelland and Dave Nevius will each share their industry perspective at the time of the 2003 Northeast Blackout. They will reflect on how things have changed since then both at the FERC and NERC/ERO level and look ahead to the challenges of the future. \n\nInside the control room at NY ISO during the 2003 Northeast Blackout  \nSteve Swan\, Principal Technical Auditor\, Operations & Planning\, RF  \n\nRF’s Steve Swan remembers Aug. 14\, 2003\, well. In fact\, he was working as an operator inside the NY ISO control room at the time the blackout occurred. He will share his perspective from the historic day and his takeaways from the experience\, 20 years later. \n\nWho should attend: \nThese presentations are especially relevant to all NERC registrations\, plus anyone interested in regulatory affairs and continuous improvement following the implementation of the Energy Policy Act of 2005. Feel free to forward the webinar link to anyone interested in learning more about how FERC\, NERC\, and the ERO Enterprise has been working together the last 20 years and continues to assess the risks of the future. Lessons learned can be applied to additional critical infrastructures as well (water\, natural gas\, communications\, etc.) \nReference Materials: \n2023-08-14 Tech Talk
URL:https://www.rfirst.org/event/technical-talk-with-rf-8/
LOCATION:Virtual (Webex)
CATEGORIES:Webinars
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230823T090000
DTEND;TZID=America/New_York:20230823T120000
DTSTAMP:20260424T130606
CREATED:20231108T174638Z
LAST-MODIFIED:20240220T033006Z
UID:7153-1692781200-1692792000@www.rfirst.org
SUMMARY:Q3 Compensation Committee Meeting
DESCRIPTION:Reference Materials: \n2023-08-23-24 Schedule of Events \n2023-08-23 Compensation Committee Agenda \n2023 3rd Qtr Board Announcement
URL:https://www.rfirst.org/event/q3-compensation-committee-meeting/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230823T130000
DTEND;TZID=America/New_York:20230823T150000
DTSTAMP:20260424T130606
CREATED:20231108T194619Z
LAST-MODIFIED:20240220T032449Z
UID:7187-1692795600-1692802800@www.rfirst.org
SUMMARY:Q3 Compliance Committee Meeting
DESCRIPTION:Reference Materials: \n2023-08-23-24 Schedule of Events \n2023-08-23 Compliance Committee Agenda \n2023 3rd Qtr Board Announcement
URL:https://www.rfirst.org/event/q3-compliance-committee-meeting/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230823T151000
DTEND;TZID=America/New_York:20230823T171000
DTSTAMP:20260424T130606
CREATED:20231109T151941Z
LAST-MODIFIED:20240220T032527Z
UID:7221-1692803400-1692810600@www.rfirst.org
SUMMARY:Q3 Finance and Audit Committee Meeting
DESCRIPTION:Reference Materials: \n2023-08-23-24 Schedule of Events \n2023-08-23 Finance and Audit Committee Agenda \n2023 3rd Qtr Board Announcement
URL:https://www.rfirst.org/event/q3-finance-and-audit-committee-meeting/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230823T151000
DTEND;TZID=America/New_York:20230823T171000
DTSTAMP:20260424T130606
CREATED:20231109T152948Z
LAST-MODIFIED:20240220T032406Z
UID:7223-1692803400-1692810600@www.rfirst.org
SUMMARY:Q3 Nominating and Governance Committee Meeting
DESCRIPTION:Reference Materials: \n2023-08-23-24 Schedule of Events \n2023-08-23 Nominating and Governance Committee Agenda \n2023 3rd Qtr Board Announcement
URL:https://www.rfirst.org/event/q3-nominating-and-governance-committee-meeting/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230824T090000
DTEND;TZID=America/New_York:20230824T130000
DTSTAMP:20260424T130606
CREATED:20231109T153846Z
LAST-MODIFIED:20240220T032313Z
UID:7227-1692867600-1692882000@www.rfirst.org
SUMMARY:Q3 Board of Directors Meeting
DESCRIPTION:Reference Materials: \n2023-08-23-24 Schedule of Events \n2023-08-24 Board of Directors Agenda \n2023 3rd Qtr Board Announcement
URL:https://www.rfirst.org/event/q3-board-of-directors-meeting/
LOCATION:ReliabilityFirst\, 3 Summit Park Dr #600\, Independence\, OH\, 44131\, United States
END:VEVENT
END:VCALENDAR