BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ReliabilityFirst - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rfirst.org
X-WR-CALDESC:Events for ReliabilityFirst
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250806T090000
DTEND;TZID=America/New_York:20250806T130000
DTSTAMP:20260416T193027
CREATED:20250501T183250Z
LAST-MODIFIED:20250808T124330Z
UID:11343-1754470800-1754485200@www.rfirst.org
SUMMARY:Protection System Workshop
DESCRIPTION:Mark your calendar for RF’s 11th Annual Protection System Workshop on Aug. 6\, 2025\, from 9 a.m. – 1 p.m. ET. This event will be held virtually via Webex. There is no fee to attend this workshop and it is open to anyone interested. \nClick here to register. \nIntended Audience\nThe ideas\, suggestions and stories shared during this highly interactive\, free event are especially relevant for: \n\nSubstation and Transmission Maintenance personnel\nProtection and Controls experts\nOperations Control Rooms\, including tools support personnel for EMS\, SCADA\, etc.\nAsset Design Groups (substation and transmission)\n\nAgenda\n\n\n\n Presentation \nPresenter \nTime (Eastern) \n\n\nWelcome and introductions\nJohnny Gest\, ReliabilityFirst\n9:00 – 9:05 AM\n\n\nWhy we are here\nThomas Teafatiller\, ReliabilityFirst\n9:05 – 9:35 AM\n\n\nApplication of large language models for protection relay settings configuration\nTapas Barik\, EPRI\n9:35 – 10:05 AM\n\n\nComparative analysis of transmission lines falling conductor protection\nMatthew Leyba\, GE Vernova\n10:05 – 10:35 AM\n\n\nComparing ride-through requirements for IBRs in NERC Reliability Standard PRC-029 and IEEE std 2800-2022\nManish Patel\, Silicon Ranch\n10:35 – 11:05 AM\n\n\n\nBreak – 15 Minutes \n\n\n\nVirtualization of protection systems in distribution design\, implementation\, and performance testing\nAlexandr Stinskiy\, Siemens\n11:20 – 11:50 AM\n\n\nA novel underfrequency load-shedding solution to avoid blackouts under low system inertia conditions\nKevin Jones\, Xcel Energy\n11:50 AM – 12:20 PM\n\n\nRenewable energy protection PRC-029 ride through\nDan Ransom\, GE Vernova\n12:20 – 12:50 PM\n\n\nWrap-up and closing remarks\nThomas Teafatiller\, ReliabilityFirst\n12:50 PM\n\n\n\nIf you have any questions\, please contact Thomas Teafatiller\, Principal Engineer – Protection\, Engineering & System Performance\, or John Idzior\, Principal Engineer – Reliability\, Engineering & System Performance.
URL:https://www.rfirst.org/event/protection-system-workshop-2025/
LOCATION:Virtual
CATEGORIES:Webinars
ATTACH;FMTTYPE=image/jpeg:https://www.rfirst.org/wp-content/uploads/2023/11/PS-HP-Workshop-website-graphics.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250807T090000
DTEND;TZID=America/New_York:20250807T130000
DTSTAMP:20260416T193027
CREATED:20250501T183638Z
LAST-MODIFIED:20250808T124303Z
UID:11348-1754557200-1754571600@www.rfirst.org
SUMMARY:Human Performance Workshop
DESCRIPTION:Mark your calendar for RF’s 8th Annual Human Performance Workshop on Aug. 7\, 2025\, from 9 a.m. – 1 p.m. ET. This event will be held virtually via Webex. There is no fee to attend this workshop and it is open to anyone interested. \nClick here to register. \nIntended Audience\nThe ideas\, suggestions and stories shared during this highly interactive\, free event are especially relevant for: \n\nHuman Resource Professionals\nAsset Management Groups\nInternal Control Champions and Specialists\nCompany Trainers\nLeadership and others interested in these topics\nSubstation and Transmission Maintenance personnel\nProtection and Controls experts\nOperations Control Rooms\, including tools support personnel for EMS\, SCADA\, etc.\nAsset Design Groups (substation and transmission)\n\nAgenda\n\n\n\n Presentation \nPresenter \nTime (Eastern) \n\n\nWelcome and introductions\nJohn Idzior\, ReliabilityFirst\n9:00 – 9:05 AM\n\n\nHuman Performance metrics & Why we are here\nJohnny Gest\, ReliabilityFirst\n9:05 – 9:35 AM\n\n\nUsing AI to improve safety communication and leadership in the field\nBarry Nelson\, FactorLab\n9:35 – 10:20 AM\n\n\nReducing injury and preserving the industrial athlete\nDr. James Weinstein\, Mississippi State University\n10:20 – 11:05 AM\n\n\n\nBreak – 15 Minutes \n\n\n\nImproving content retention in training & learning\nFelicia Bowins\, Hank Mast\, Index AR Solutions\n11:20 AM – 12:00 PM\n\n\nThe culture of performance\nLaRhonda Julien\, Georgia Transmission\n12:00 – 12:45 PM\n\n\nClosing remarks\nJohn Idzior\, ReliabilityFirst\n12:45 PM\n\n\n\nIf you have any questions\, please contact John Idzior\, Principal Engineer – Reliability\, Engineering & System Performance. or Thomas Teafatiller\, Principal Engineer – Protection\, Engineering & System Performance.
URL:https://www.rfirst.org/event/human-performance-workshop-2025/
LOCATION:Virtual
CATEGORIES:Webinars
ATTACH;FMTTYPE=image/jpeg:https://www.rfirst.org/wp-content/uploads/2023/11/PS-HP-Workshop-website-graphics-1.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250818T140000
DTEND;TZID=America/New_York:20250818T153000
DTSTAMP:20260416T193027
CREATED:20241106T205924Z
LAST-MODIFIED:20250819T123653Z
UID:10674-1755525600-1755531000@www.rfirst.org
SUMMARY:Technical Talk with RF
DESCRIPTION:ReliabilityFirst (RF) offers a regularly scheduled monthly call to provide entities and stakeholders with a forum for addressing topics and questions relevant to reliability\, resilience and security.   \nWhile RF Subject Matter Experts (SMEs) will provide presentations and updates\, they will not address entity-specific questions and issues. These types of questions can be handled offline by using the RF Assist Visit program. If you have any questions\, please reach out to Mike Hughes\, Entity Engagement Manager\, 216-503-0617.    \nEvent Information   \nAugust 2025 Technical Talk with RF    \nMonday\, Aug. 18\, 2025\, 2:00 – 3:30 p.m. ET   \nJoin link:  https://reliabilityfirst.webex.com/reliabilityfirst/j.php?MTID=m40f6175b7cef6561a96ec5301969f1d3  \nMeeting number: 2313 993 1902  \nMeeting password: 0123456 (0123456 when dialing from a phone or video system)   \nJoin by phone: 1-650-479-3207 Call-in toll number (US/Canada)   \nAccess code: 231 399 31902  \nPlease join us on Slido.com using #TechTalkRF as the event code.   \n  \nAgenda  \nWhat to know about NERC Reliability Standard PRC-029-1 and how it will impact inverter-based resources (IBRs)  \nDan Ransom\, Senior Consulting\, Technical Application Engineer\, GE Vernova  \nNERC Reliability Standard PRC-029-1 (Frequency and Voltage Ride-through Requirements for Inverter-Based Resources) was developed to replace PRC-024 (Frequency and Voltage Protection Settings for Generating Resources) and PRC-026 (Relay Performance During Stable Power Swings) specifically for inverter-based resources (IBRs). This is a strategic shift designed to improve clarity and reliability\, especially during grid disturbances\, in an increasingly inverter-driven grid by establishing performance-based ride-through requirements tailored to their unique capabilities.  \nHistorically\, IBRs were included under PRC-024 and PRC-026\, which were originally designed with synchronous generators in mind. However\, these standards do not adequately reflect the unique dynamic behavior and control capabilities of IBRs. PRC-029-1 establishes tailored ride-through requirements—both capability-based and performance-based—specifically for IBRs\, ensuring they remain connected and support grid stability during voltage and frequency excursions.   \n  \nRate of Change of Frequency and Underfrequency Load Shedding  \nJohn “JP” Skeath\, Senior Engineer\, NERC  \nJP Skeath will discuss Rate of Change of Frequency as it relates to underfrequency load shedding. With the ever-increasing mix of inverter-based resources powering the electric grid\, this relationship has gained importance\, as system inertia decreases.  \n  \nReference Materials\nTech Talk with RF – August 2025
URL:https://www.rfirst.org/event/technical-talk-with-rf-august-2025/
LOCATION:Virtual (Webex)
CATEGORIES:Webinars
ATTACH;FMTTYPE=image/png:https://www.rfirst.org/wp-content/uploads/2023/08/Tech-Talk-event-teaser-updated-1.png
END:VEVENT
END:VCALENDAR