BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ReliabilityFirst - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rfirst.org
X-WR-CALDESC:Events for ReliabilityFirst
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250806T090000
DTEND;TZID=America/New_York:20250806T130000
DTSTAMP:20260417T100141
CREATED:20250501T183250Z
LAST-MODIFIED:20250808T124330Z
UID:11343-1754470800-1754485200@www.rfirst.org
SUMMARY:Protection System Workshop
DESCRIPTION:Mark your calendar for RF’s 11th Annual Protection System Workshop on Aug. 6\, 2025\, from 9 a.m. – 1 p.m. ET. This event will be held virtually via Webex. There is no fee to attend this workshop and it is open to anyone interested. \nClick here to register. \nIntended Audience\nThe ideas\, suggestions and stories shared during this highly interactive\, free event are especially relevant for: \n\nSubstation and Transmission Maintenance personnel\nProtection and Controls experts\nOperations Control Rooms\, including tools support personnel for EMS\, SCADA\, etc.\nAsset Design Groups (substation and transmission)\n\nAgenda\n\n\n\n Presentation \nPresenter \nTime (Eastern) \n\n\nWelcome and introductions\nJohnny Gest\, ReliabilityFirst\n9:00 – 9:05 AM\n\n\nWhy we are here\nThomas Teafatiller\, ReliabilityFirst\n9:05 – 9:35 AM\n\n\nApplication of large language models for protection relay settings configuration\nTapas Barik\, EPRI\n9:35 – 10:05 AM\n\n\nComparative analysis of transmission lines falling conductor protection\nMatthew Leyba\, GE Vernova\n10:05 – 10:35 AM\n\n\nComparing ride-through requirements for IBRs in NERC Reliability Standard PRC-029 and IEEE std 2800-2022\nManish Patel\, Silicon Ranch\n10:35 – 11:05 AM\n\n\n\nBreak – 15 Minutes \n\n\n\nVirtualization of protection systems in distribution design\, implementation\, and performance testing\nAlexandr Stinskiy\, Siemens\n11:20 – 11:50 AM\n\n\nA novel underfrequency load-shedding solution to avoid blackouts under low system inertia conditions\nKevin Jones\, Xcel Energy\n11:50 AM – 12:20 PM\n\n\nRenewable energy protection PRC-029 ride through\nDan Ransom\, GE Vernova\n12:20 – 12:50 PM\n\n\nWrap-up and closing remarks\nThomas Teafatiller\, ReliabilityFirst\n12:50 PM\n\n\n\nIf you have any questions\, please contact Thomas Teafatiller\, Principal Engineer – Protection\, Engineering & System Performance\, or John Idzior\, Principal Engineer – Reliability\, Engineering & System Performance.
URL:https://www.rfirst.org/event/protection-system-workshop-2025/
LOCATION:Virtual
CATEGORIES:Webinars
ATTACH;FMTTYPE=image/jpeg:https://www.rfirst.org/wp-content/uploads/2023/11/PS-HP-Workshop-website-graphics.jpg
END:VEVENT
END:VCALENDAR